top of page

Step by Step

AiR studio

Better decisions at every stage.

From plot selection to a home ready to live in.

​

Independent architectural guidance backed by 40 years of professional experience.

​

A personalised approach to protecting your investment, anticipating construction risks and making informed decisions at every step.

ARCHITECTURE   ·   INVESTMENT   ·   PREVENTION

MAXIMUM  CONFIDENCE

40 YEARS EXPERIENCE   ·   ONLINE CONSULTING   ·   COSTA DEL SOL

+

End-to-end advisory

​

Continuity of technical advice across selected stages, under an agreed scope and responsibility.
 

FROM PLOT TO HOME

Del solar a la casa terminada_edited.jpg

PROPERTY INSIGHTS​

Before deciding, understand the risks.

Two briefings on technical and planning questions worth examining in Costa del Sol residential transactions.

A significant property decision requires more than a viewing. Architectural and technical due diligence helps identify constraints that may affect a project's feasibility, cost and future development.

VILLAS · PRE-PURCHASE
Five risks a property viewing may not reveal.

Planning permits, extensions, floor areas, concealed defects, flood exposure and premature deposits. In Q3 2026, foreign buyers accounted for 38.83% of registered home purchases in Málaga province, according to Spain's Property Registrars. This is a market indicator, not a rate of problematic transactions. Before buying a villa, check planning status, registered ownership and encumbrances, cadastral records and the apparent technical condition. Marbella's 2010 urban plan was annulled and a new PGOM was definitively approved in September 2026; neither fact replaces a property-specific review. Architectural due diligence complements, but does not replace, legal and tax checks. A visual survey cannot guarantee that hidden defects are absent.

PLOTS · FEASIBILITY

A sea view does not guarantee building rights.

Planning, boundaries, topography, drainage, coastal restrictions and infrastructure costs. Marbella's definitively approved PGOM of September 2026 shows why buyers must check current planning instruments, their legal effect and the rules for the specific site. The POU is a separate instrument. Land Registry and Cadastral descriptions may differ from physical boundaries. Sites close to watercourses or the coast require checks of official flood maps and coastal protections. Spanish coastal law generally provides a 100-metre protection easement, subject to exceptions. Commission preliminary feasibility and coordinate purchase conditions with a lawyer before making major commitments.

INITIAL CONVERSATION

​

What decision do you need to make?

Briefly describe your project, approximate location, timeframe and main question. We can then discuss an appropriate scope of professional advice.

CONFIDENTIALITY  AND   DISCRETION

Your project is private.
Your information deserves respect.

We handle enquiries discreetly, restricting information to the agreed professional purposes and applying appropriate organisational and technical safeguards.

How we work

​

We do not request confidential plans or personal documents through this page. After engagement, we will agree a private channel for the necessary documents with restricted access.

​

Confidentiality relies on actual safeguards and legal duties; absolute security cannot be guaranteed.

INITIAL PRIVATE CONSULTATION

 

Briefly describe the project, its approximate location, the timeline, and the main issue.

 

Do not attach documents or sensitive information during this first contact; the exchange of documentation will be carried out through a private channel.

Step of interest
bottom of page